D A U Web Mast Head Graphic - left
homeaboutstudent informationpublicationslocationsCareers at DAUiCatalogDefense Acquistion Portal
 
DAU Courses
CLE 047 Grounding, Bonding and Shielding
(Last Modified:09-Aug-2012)

apply

print


Description
This module is relatively technical and provides students with a comprehensive understanding of the importance of a properly grounded, bonded, and shielded system for the minimization of Electromagnetic Interference (EMI). Students become acquainted with specialized terminology, grounding schematics, bonding practices and types, and the basic rules for the implementation of shields to control radiated EMI. Students will be equipped with a baseline knowledge that will prepare them for real-time experience in the field.
Objectives
Target Attendees
Prerequisite(s)
none
Predecessor Course(s) (Acceptable as a substitute for this course until the acceptance date specified below.)
Predecessor Predecessor Course Title PDS Code Accepted Until
None None None None
Course Length
Approximately 2 hours
Additional Course Information
Delivery Mode Continuous Learning
Equivalent Courses None
ACE Recommended Credits N/A
PDS Code ZKD
Additional Public Information N/A
Continuing Education Units   0
Continuous Learning Points  2
Reservist Retirement Points  1
Historical Allocations Mouse Over for Past CEU/CLPs
Notes
  • Technical requirements for this course.
  • You have 60 days to complete this course.
  • This course contains an end of module test that must be passed with a 100% score.
  • After passing your exam, please be sure to complete the required Module Survey from the Table of Contents. You will not be graduated from the module until you have completed the Survey. If you experience any difficulty in completing the Survey, please contact the DAU Help Desk to ensure that you receive proper credit.
  • Contact Us | Suggestion Box | Security & Privacy Notice | Legal Notices         DAU Help Desk 703-805-3459 | 1-866-568-6924