TN Valley Authority

TN Valley Authority

@TVA_Newsroom

The mission of the Tennessee Valley Authority is to serve the Tennessee Valley through Energy, Environment, and Economic Development.

· http://www.tva.gov

Tweets

TVA is about to peel the top off a reactor at Sequoyah Nuclear Plant in a $360 million project:

Nuclear Steam Generator Plant Operators are posted based on the needs of each plant. Not sure when the next one will be.

Looking forward to 's John Sevier natural gas-fired plant dedication. We must keep electricity affordable for the TN Valley.

We had a blast hosting the 40 students from Scottsboro High School today to talk about engineering careers at TVA.

See the super structure being built on top of reactor building at Sequoyah Nuclear for replacement of steam generators.

Employees at Watts Bar Nuclear Plant paused this morning to commemorate National POW/MIA Recognition Day.

Here's the 175-ton reactor head of Watts Bar Unit 1 as it is removed to prepare for refueling operations.

Workers at the Watts Bar 2 nuclear construction project have reached 16 million work hrs without a lost-time accident.

has placed our Ocoee Dam No. 1 into their Hall of Fame. Check out the story on this dam's great legacy.

Larry the Cable Guy visited Fontana Dam this week for his show "Only in America". It will air sometime early next year.

Swafford: “Making improvements at Browns Ferry also will help us see areas at our other nuclear plants that may need to be looked at.”

Loading seems to be taking a while.

Twitter may be over capacity or experiencing a momentary hiccup. Try again or visit Twitter Status for more information.