contract- RECIPIENT AWARD SUMMARY

.ABHE & SVOBODA, INC

Clarification of Codes


AWARD OVERVIEW

AWARD OVERVIEW
Agency Name: Department of the Interior Project Location: LARIMER
Award Number: INR10PC60R14 Project Location - State: CO
Funding Amount: $0 Project Location - Zip Code: 805378922
Ending Date: 2011-01-02 Congressional District: 04

RECIPIENT INFORMATION (AWARD)

RECIPIENT INFORMATION (AWARD)
Recipient Name: .ABHE & SVOBODA, INC
Recipient Address: 17066 REVERE WAY
Recipient City: PRIOR LAKE
Recipient State: MN
Recipient Zip Code: 553722978
Congressional District: MN-02

DESCRIPTION OF WORK/SERVICE PERFORMED

MODIFICATION NEEDED TO REDUCE ' ON PAPER ONLY" THE PAYMENT COMPLETED BY VOUCHER #1. NO OBLIGATION NEEDED. TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000






TRANSACTIONS

TRANSACTIONS

Other Awards

Other Awards
Amount: $4,130,700
Award Description: TAS::96 3135::TAS RECOVERY - REPAIR BULKHEAD PT PLEASANT CANAL NJIWNJ
Amount: $11,343,250
Award Description: TAS::96 3135::TAS REPAIR AND REPAINTING OF TAINTER GATES AT WHITNEY LAKE, CLIFTON, TEXAS
Amount: $12,235,100
Award Description: RECOVERY-FLATIRON POWERPLANT, RECOATING AND RELINING OF PENSTOCKS 1 AND 2, COLORADO-BIG THOMPSON PROJECT, COLORADO. (TAS::14 0681::TAS, BUREAU PROJECT IDENTIFICATION NUMBER 10.000) THIS PROJECT IS FUNDED BY THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (ARRA). THE PRINCIPAL COMPONENTS OF THE WORK CONSIST OF: REMOVING COATING SYSTEM FROM EXTERIOR OF PENSTOCKS NOS. 1 AND 2, INCLUDING REMOVING, HANDLING, AND DISPOSING OF PAINT CONTAINING LEAD AND OTHER HEAVY METALS. PREPARING SURFACE AND APPLYING NEW COATING SYSTEM TO EXTERIOR OF PENSTOCKS NOS. 1 AND 2. REMOVING AND DISPOSING OF LINING SYSTEM FROM INTERIOR OF PENSTOCKS NOS. 1 AND 2, INCLUDING REMOVING, HANDLING, AND DISPOSING OF PAINT CONTAINING COAL TAR PRODUCTS. PREPARING SURFACE AND APPLYING NEW LINING SYSTEM TO INTERIOR OF PENSTOCKS NOS. 1 AND 2. REMOVING AND DISPOSING OF COATING SYSTEM FROM STEEL WORK PLATFORM SUPPORTS, STAIRS, AND HANDRAILS AT VALVE STRUCTURE AND UPSTREAM OF ANCHOR NO. 14; PREPARING SURFACE AND RECOATING. REMOVING COATING SYSTEM FROM THE INTERIOR AND EXTERIOR OF THE 84-INCH BUTTERFLY VALVES, INCLUDING REMOVING, HANDLING, AND DISPOSING OF PAINT CONTAINING LEAD AND OTHER HEAVY METALS. PREPARING SURFACE AND RECOAT THE INTERIOR AND EXTERIOR OF THE 84-INCH BUTTERFLY VALVES.
Amount: -$1
Award Description: MODIFICATION REQUIRED TO DEOBLIGATE REMAINING OF FUNDS UNDER OLD COST STRUCTURE. TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000
Amount: $54,405
Award Description: RECOVERY-FLATIRON PP PENSTOCK RECOATINGS. TAS::14 0681::TAS, BUREAU PROJECT ID NO. 10.00. DUNS#055473797. MODIFICATION NEEDED TO INCLUDE THE FURNISHING AND INSTALLATION OF 16 ADDITIONAL FLOWMETERS ORIGINALLY NOT INCLUDED IN THE SOLICITATION BY THE GOVERNMENT.
Amount: -$9,999,999
Award Description: MOD 1 CHANGES THE COST STRUCTURE (COST AUTHORITY) AND ADD CLAUSE 52.204-11 (FEDERAL REPORTING) DEVIATION - MARCH 2010 TO THE CONTRACT. TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000
Amount: -$2,235,100
Award Description: MOD 2 CHANGES THE COST STRUCTURE (COST AUTHORITY). TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000
Amount: -$1
Award Description: MOD 4 DEOBLIGATES THE REMAINING BALANCE UNDER THE OLD COST STRUCTURE. TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000
Amount: $12,235,100
Award Description: MOD 3 REOBLIGATES FUNDING UNDER A DIFFERENT COST STRUCTURE (COST AUTHORITY). TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000
Amount: $12,155,807
Award Description: MODIFICATION NEEDED TO REOBLIGATE THE FUNDS UNDER THE CORRECTED COST STRUCTURE. (THE FUNDS WERE DE-OBLIGATED BY MOD 5, AND 6) TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000
Amount: $0
Award Description: RECOVERY-FLATIRON PENSTOCKS RECOATING. TAS::14 0681::TAS, BUREAU PROJECT ID NO. 10.000 - THIS MODIFICATION IS NEEDED TO CORRECT THE AMOUNT IN IDEAS-PD TO MATCH THE FUNDING IN FFS. DUNS# 055473797
Amount: -$9,999,999
Award Description: MOD REQUIRED TO CHANGE COST STRUCTURE ONLY. TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000
Amount: -$2,155,807
Award Description: MODIFICATION NEEDED TO CHANGE COST STRUCTURE ONLY. TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000
Amount: $0
Award Description: MODIFICATION NEEDED TO REDUCE ' ON PAPER ONLY" THE PAYMENT COMPLETED BY VOUCHER #1. NO OBLIGATION NEEDED. TAS::14 0681::TAS, BUREAU PROJECT ID # 10.000
Amount: $304,000
Award Description: RECOVERYPROJECT#::19920::RP# TIME AND MATERIALS - ABATEMENT & PAINTING OF TAINTER GATES
Amount: $3,821,465
Award Description: RECOVERYPROJECT#::19920::RP# ABATEMENT & PAINTING OF TAINTER GATES - ADDED ADDITIONAL FUNDING FOR CLINS 7009, ADDITIONAL STRUCTURAL REPAIRS AND 7010, TIME & MATERIALS.
Amount: $16,000
Award Description: RECOVERYPROJECT#::19920::RP# ADDITIONAL STRUCTURAL STEEL REPAIRS - ABATEMENT & PAINTING OF TAINTER GATES
Amount: $5,976
Award Description: TAS::14 0681::TAS BUREAU ID #10.000 - RECOVERY ACT FUNDS. THIS MOD AUTHORIZES THE CHANGE FROM A SINGLE CONDUCTOR CABLE TO A MULTI CONDUCTOR CABLE.
Amount: $0
Award Description: TAS::14 0681::TAS - BUREAU IDENTIFICATION NUMBER: 10.000 MOD FOR A TIME EXTENSION DUE TO GOV'T DELAY IN DEWATERING PENSTOCK 1 - KTR MOVED CONTAINMENT IN PREPARATION AND HAD TO REMOVED TWICE.
Amount: $0
Award Description: TAS::14 0681::TAS - BUREAU ID 10.000 (ARRA) DUNS 055473797 MOD TO EXECUTED A TIME EXTENSION IN LIEU OF WORKING SUNDAYS. GOV'T DOES NOT HAVE AN INSPECTOR FOR SUNDAY WORK.
Amount: $0
Award Description: TAS::14 0681::TAS BUREAU ID NUMBER 10.000 THIS MODIFICATION CHANGES THE COATINGS TABULATION REQUIREMENTS AT NO ADDITIONAL COST TO THE GOVERNMENT.
Amount: $12,000
Award Description: TAS::14 0681::TAS BUREAU ID NUMBER 10.000 THIS MODIFICATION DIRECTS THE CONTRACTOR TO FURNISH CREVRON SEALS FOR THE PENSTOCKS AT POWERPLANT AND INSTAKE VALVES.
Amount: $250,000
Award Description: TAS::14 0681::TAS BUREAU ID NUMBER 10.000 THE CONTRACTOR IDENTIFIED HAZARDOUS WASTE MATERIAL FROM THE REMOVAL OF THE EXTERIOR COATING OF THE PENSTOCKS. THIS MODIFICATION DIRECTS THE CONTRACTOR TO DISPOSE OF HAZARDOUS WASTE MATERIAL, IN ACCORDANCE WITH THE SPECIFICATIONS.
Amount: $0
Award Description: REPAIR BULKHEAD PT PLEASANT CANAL NJIWNJ (LI'S 4,7,&10 ADJS)
Amount: $0
Award Description: TAS::96 3135::TAS; REPAIR BULKHEAD PT PLEASANT CANAL NJIWNJ; MOD P1 FOR 21 ADD'L WEATHER DAYS
Amount: -$110,000
Award Description: TAS:: 96 3135::TAS ARRA::YES::ARRA RECOVERYPROJECT#::19920::RP# ABATEMENT&PAINTING OF TAINTER GATES - REDUCE FUNDING FOR CLIN 7010, TIME AND MATERIALS
Amount: $0
Award Description: REPAIR BULKHEAD PT PLEASANT CANAL NJIWNJ
Amount: -$628,500
Award Description: TAS::96 3135:: TAS ARRA::YES::ARRA RECOVERY PROJECT#::19920::RP# DEOBLIGATING FUNDS FROM CLIN 7010, TIME AND MATERIALS
Amount: $76,320
Award Description: REPAIR BULKHEAD PT PLEASANT CANAL NJIWNJ MOD NO. P00005

Project Location Detail

Location Information
Latitude, Longitude 0º 0' 0", 0º 0' 0"
Congressional District 04
City LARIMER
County LARIMER
State CO
Zip 80537