Deleted: HHSAR Subpart 333.104a Protests to GAO

Subpart 333.104   Protests to GAO. (Deleted April 28, 2011)

  1. General procedures.

(3)(ii) OGC-GLD shall process protests filed with GAO, whether pre- or post-award. The Contracting Officer shall prepare protest files as follows: assemble them in a secure binder, fastened at the left side with a fastener that will permit the full page to be read; include a numerical document index, with the first two positions reserved for the Contracting Officer's Statement of Facts and Circumstances and the second for OGC-GLD's Memorandum of Law, that is paginated and, as necessary for sizable files, divided into two or more volumes; and the cover of the report shall identify it as the protest file and include the solicitation number and the GAO Bid Protest file number--i.e., ``B- number.'' In addition, the Contracting Officer shall fold drawings and place them in an envelope in the binder and the solicitation/contract shall constitute a separate exhibit, if it is voluminous. The Contracting Officer shall distribute protest files as follows: four copies to OGC-GLD and one copy to the contracting activity's protest control officer. In addition to the items listed in FAR 33.104(a)(3)(ii)(A) through (G), the protest file shall include the following documents:

Back to current HSSAR Part 333.104