2012 Renewable Energy Priority Projects

The Bureau of Land Management continues its work on environmentally responsible development of utility-scale renewable energy projects on public lands as part of the Administration's efforts to diversify the Nation's energy portfolio. 

In 2012, the BLM will be giving priority status to 17 projects (9 solar, 6 wind, and 2 geothermal) representing about 7,000 MW.  BLM developed this priority list in collaboration with the Bureau of Indian Affairs, the U.S. Fish and Wildlife Service and the National Park Service, with an emphasis on early consultation. The 2012 priority projects were selected based on a variety of criteria, including progress of the necessary public participation and environmental analysis under NEPA and applicable state environmental laws.  BLM also used the screening criteria for priority solar and wind projects, developed through BLM policy memoranda issued in February 2011, to assist in evaluating and prioritizing the projects on this list.

The table below indicates the locations and other details regarding the BLM's priority renewable energy projects for 2012. Links are given to related BLM and state web pages, as well as Federal Register notices.

Related link:

DEIS = Draft EISFONSI = Finding of No Significant Impact
EA = Environmental AssessmentNOI = Notice of Intent
EIS = Environmental Impact StatementROD = Record of Decision

   Solar Energy Projects

State
Project Name
[Applicant]
(Location)
Technology
Potential Output (MW) a
BLM Acreage
Status
AZ
Quartzsite Solar Energy
[Solar Reserve]

 Power Tower

100

 1,500

NOI published 1/14/2010
Draft EIS published 11/10/2011
CA
McCoy Solar
[NextEra]

 PV

750

 7,754

NOI published 8/29/2011
Draft EIS published 5/25/2012
CA

Desert Harvest
[enXco]

 PV

100
 930
NOI published 9/15/2011
Draft EIS published 4/13/2012
CA
Calico Solar Redesign
[K Power]

 PV

-- b
 4,613
NOI published 10/25/2011
CA

Ocotillo Sol
[San Diego Gas & Electric]

 PV

14
 115

NOI Published 7/17/2011
Draft EIS published 4/20/2012

CA

Mount Signal Solar Farm #1
[82LV 8ME, LLC]

 PV

600

See note c
below

EA Pending
NV
Amargosa North Solar  
[Pacific Solar Investments ]

 PV

150
 7,500
NOI published 12/14/2009
Draft EIS pending

NV

Silver State South
[First Solar]

 PV

350

 1,400

NOI published 9/1/2011
Draft EIS pending

NV
Moapa Solar Project         
[K Road Power]
(Clark County)
PV
350
See note d
below
NOI published 2/4/2011
Draft EIS published 11/25/2011
Final EIS published 3/16/2012
ROD signed 6/21/2012

a   Potential output may change depending on the analysis and review of each project.
b  The Calico solar project was previously approved in 2010, but the project has been redesigned with solar PV technology and will require additional BLM approval.  The 664-MW capacity for this project is not counted as new MW capacity in the total MWs for the 2012 Priority projects.
Projects on private land:  denotes "connected action" projects that will require BLM authorizations for off-site faciliites (transmission, access, etc.).
d 2,000 acres of Tribal land, with about 12 acres of BLM-managed public land for the associated 500-kv transmission line.

  Wind Energy Projects

State

Project Name
[Applicant]
(County)
Potential Output (MW) a
BLM Acreage
Status
AZMohave County Wind Farm
[BP Wind]
500
 31,338
NOI published 7/26/2010
Draft EIS published 5/4/2012
CAWalker Ridge Wind
[AltaGas]
70

 7,882

NOI published 8/13/2010
Draft EIS pending
NV
Searchlight Wind
[Duke Energy]
200
 24,382
NOI published 12/16/2008
Draft EIS published 1/20/2012
WYSand Hills Ranch
[Shell Wind Energy]
50
 3,101

Project schedule delayed beyond 2012.
Final EA pending action by applicant.

WYChoke Cherry/Sierra Madre
[Power Co. of WY]

3,000

107,105

Draft EIS released 7/22/2011
Final EIS pending

WYWhite Mountain
[Teton Wind LLC]

360

2,461

EA FONSI 8/15/2011

a   Potential output may change depending on the analysis and review of each project.

   Geothermal Energy Projects 

State
Project Name
[Applicant]
(County)
Potential Output (MW) a
BLM Acreage
Status
CACasa Diablo
[Mammoth Pacific]
33
 

NOI published 3/25/2011

NVNew York Canyon
[Terragen]
62

 15,135

EA pending

 

 

 

 

a   Potential output may change depending on the analysis and review of each project.