CALIFORNIA HIGH SPEED RAIL AUTHORITY
This cooperative agreement covers the preparation of Preliminary Engineering (PE) and Environmental Documents for Phase 1 of the CHSTP as well as construction of an initial construction section of the project after ROD/NOD. More specifically, it will help fund the planning and environmental phase through Final Environmental Impact Report (EIR)/Environmental Impact Statement (EIS) documents and signed Notices of Determination and Records of Decision for each of seven geographic sections, and develop necessary documents for design/build bidding. The CHSTP will implement a new high-speed rail system, completely grade-separated from road vehicle traffic and operated almost exclusively on separate, dedicated tracks with a top design speed of up to 250 mph and operating speed of up to 220 mph. The 800-mile statewide program will provide reliable, high-speed, electrified train service between the Bay Area, the Central Valley, Sacramento, and Southern California.
AWARD OVERVIEW |
Award Number |
FR-HSR-0009-10-01-00 |
Funding Agency |
Department of Transportation |
Total Award Amount |
$2,552,556,231 |
Project Location - City |
Sacramento |
Award Date |
09/30/2010 |
Project Location - State |
CA |
Project Status |
Less Than 50% Completed |
Project Location - Zip |
95814-3704
|
Jobs Reported |
194.00 |
Congressional District |
05 |
Project Location - Country |
US |
|
|
Recipient Information
(Grants)
Recipient Information (Grants) |
Recipient Name
|
CALIFORNIA HIGH SPEED RAIL AUTHORITY |
Recipient DUNS Number |
011075376
|
Recipient Address |
925 L ST STE 1425 |
Recipient City |
SACRAMENTO |
Recipient State |
California |
Recipient Zip |
95814-3704 |
Recipient Congressional District |
05 |
Recipient Country |
USA |
Required to Report Top 5 Highly Compensated Officials |
No |
Projects and Jobs Information
Projects and Jobs Information |
Project Title |
California High-Speed Train Program ARRA Grant |
Project Status |
Less Than 50% Completed |
Final Project Report Submitted |
No |
Project Activities Description |
Engineering Services |
Quarterly Activities/Project Description |
Program Mngt: continued devel of v3 of FY 12/13 AWP.
2012
Business Plan: Received board approve of revised plan on 4-18.
Environment: Released & certified M-F final eir/eis; Draft rod submitted and under FRA review; Continued work on revised draft EIR/Supp EIS for F-B; Continued work on all other sections.
Engineering: Conducted workshops with CP-1 proposers; Supported development of addendum to CP-1 RFP; Completed VE assessment for ICS.
ROW: RFP for ROW support services submitted for FRA review; Continued prelim ROW activities for CP1 A&B; developed appraisal maps, applied for NODAs, prepared draft and final appraisals.
Ops Planning: Submitted blended svs plan, service development plan, conops plan, manual for rolling stock/insfrastructure maintenance to FRA.
Commercial Operations: Continued prep for RFQs for CP2-4 and timeline for procurements; completed 3 addendums for CP-1; submitted RFQ for CM services to FRA.
Planning: Continued assistance to City of Fresno on station-area plan, continued state-wide coordination for blended service implementation; Submitted MOU with SOCAl rail operators and MTC to Board for approval; Continued to assist stakeholders in NOCAL in MOU devel.
|
Jobs Created |
194.00 |
Description of Jobs Created |
Acquisition and Design to support PE, NEPA and Other-related work supporting environmental process. |
Purchaser Information
(Grants)
Purchaser Information |
Contracting Office ID |
Not Reported |
Contracting Office Name |
Not Available |
Contracting Office Region |
Not Available |
TAS Major Program |
69-0718 |
Award Information |
Award Date |
09/30/2010 |
Award Number |
FR-HSR-0009-10-01-00 |
Order Number |
|
Award Type |
Grants |
Funding Agency ID |
69 |
Funding Agency Name |
Department of Transportation |
Funding Office Name |
Not Available |
Awarding Agency ID |
69 |
Awarding Agency Name |
Department of Transportation |
Amount of Award |
$2,552,556,231 |
Funds Invoiced/Received |
$56,373,116 |
Expenditure Amount |
$56,373,116 |
Infrastructure Expenditure Amount |
$56,373,116 |
Infrastructure Purpose and Rationale |
Phase 1 of this project includes the construction of approximately 520 miles of a high-speed rail system between San Francisco and Anaheim. This will begin with the construction of rail infrastructure on an initial construction section from Madera County to Bakersfield (Kern County).
This project supports the purpose and rationale of ARRA infrastructure investments by investing in the development of a high-speed rail transportation system that will create and promote job growth, protect the environmental and provide long-term economic benefits to the State of California. |
Infrastructure Point of Contact Name |
Leslie Rifkin, Grant Administrator |
Infrastructure Point of Contact Email |
lrifkin@hsr.ca.gov |
Infrastructure Point of Contact Phone |
(916) 431-2934 |
Infrastructure Point of Contact Address |
770 L Street, STE 800 |
Infrastructure Point of Contact City |
Sacramento |
Infrastructure Point of Contact State |
CA |
Infrastructure Point of Contact Zip |
95814-3704 |
Product or Service Information
(Grants)
Product or Service Information |
Primary Activity Code |
541330 |
Activity Description |
Engineering Services |
Sub-Awards Information |
Sub-awards to Organizations |
0 |
Sub-award Amounts to Organizations |
$0 |
Sub-Awards to Individuals |
0 |
Sub-Award Amounts to Individuals |
$0 |
Number of Sub-awards less than $25,000/award |
0 |
Amount of Sub-awards less than $25,000/award |
$0 |
Number of payments to vendors greater than $25,000 |
0 |
Total Amount of payments to vendors greater than $25,000/award |
$0 |
Number of payments to vendors less than $25,000/award |
0 |
Total Amount of payments to vendors less than $25,000/award |
$0 |
Location Information |
Latitude, Longitude |
38º 34' 44",
-121º 29' 50" |
Congressional District |
05 |
Address 1 |
770 L ST STE 800 |
Address 2 |
|
City |
Sacramento |
County |
Sacramento |
State |
CA |
Zip |
95814-3704 |
|
|