Bureau of Reclamation Lower Colorado Region Banner
Reclamation Home             Reclamation Offices             Newsroom             Library             Projects & Facilities

Colorado River Basin Water Supply & Demand Study

Quick Links

new button Updated Study Timeline

Technical Memorandum C - Quantification of Water Demand Scenarios
     Press Release

Options Received to Resolve Water Supply and Demand Imbalances

Updated Technical Reports - Water Supply Assessment and System Reliability Metrics

Interim Report No.1

Fact Sheets, Outreach Info and Related Studies/Reports

Add me to the e-mail list
Enter "Add Me" in the Subject line


The Bureau of Reclamation's Upper Colorado and Lower Colorado Regions, in collaboration with representatives of the seven Colorado River Basin States (non-federal Cost Share Partners), submitted a Proposal in June 2009 to fund the "Colorado River Basin Water Supply and Demand Study" under Reclamation's Basin Study Program. In September 2009, the Study was selected for funding.

The Study, which began in January 2010, is projected to be complete in November 2012. It will define current and future imbalances in water supply and demand in the Colorado River Basin and the adjacent areas of the Basin States that receive Colorado River water for approximately the next 50 years, and will develop and analyze adaptation and mitigation strategies to resolve those imbalances.

The Study will characterize current and future water supply and demand imbalances in the Basin and assess the risks to Basin resources. Resources include water allocations and deliveries consistent with the apportionments under the Law of the River; hydroelectric power generation; recreation; fish, wildlife, and their habitats (including candidate, threatened, and endangered species); water quality including salinity; flow and water dependent ecological systems; and flood control.



Updated Study Timeline
January 2010
Begin Study
February-November 2011
Quantify Demand Scenarios
June 2011
Publish Interim Report No. 1
December 2011-February 2012
Perform 'Baseline" System Reliability Analysis
November 2011-February 2012
Develop Options and Strategies
February - May 2012
Publish Technical Updates
February - May 2012
Perform System Reliability Analysis with Options and Strategies
May - September 2012
Finalize and Evaluate Options and Strategies
November 2012
Publish Final Study Report

Additional information, questions, and/or comments on the Study may be directed to:

Pam Adams
phone: 702-293-8500
fax: 702-293-8418

Webmaster: Colleen Dwyer, cdwyer@usbr.gov
Updated: September 2012