Accessibility Information

Users of assistive technologies such as screen readers should use the following link to activate Accessibility Mode before continuing: Learn more and Activate accessibility mode.

Brumidi Corridor Murals Conservation and Restoration

Solicitation Number: RFP110156
Agency: Architect of the Capitol
Office: AOC Acquisition & Material Management Division
Location: Acquisition and Material Management Division
  • Print
:
RFP110156
:
Award
:
July 2, 2012
:
AOC12C1010
:
$780,308.00
:
1, 2, 3
:
Cunningham-Adams Conservation, LTD
:
413 A Street, N.E.

Washington, District of Columbia 20002-5939
United States
:
Added: Nov 14, 2011 11:07 am
The Architect of the Capitol (AOC) has a requirement for Conservation and Restoration of the Brumidi Corridor murals in at the Senate wing of  the United States Capitol, Washington, District of Columbia.

Conservation and Restoration will fall into one or a combination of  FULL RESTORATION, PARTIAL CONSERVATION, or REPLICATION as will be described in the Statement of Work.
The wall and ceiling murals in the vaulted, ornately decorated Brumidi Corridors on the first floor of the Senate wing in the United States Capitol were painted in a variety of painting materials and techniques in the mid to late nineteenth century. 
Most of the walls and ceilings were overpainted one or more times starting in the twentieth century. Previous conservation studies and treatment reports will be listed in solicitation and will be available for review. 

The current conditions of the walls and ceilings in the Brumidi Corridors vary, so that the proportion of conservation to replication required will also vary with each area.


Contractor may be required to provide scaffolding where necessary for completion of their
work.

Please refer to site visit instructions in the attachments herewith.

Added: Dec 21, 2011 7:23 am

Please see amendment 02

Please consult the list of document viewers if you cannot open a file.

Package #1

Posted Date:
November 14, 2011
SOW 10Nov2011.doc (5,766.00 Kb)
Description: RFP110156 SOW/Specs

Package #2

Posted Date:
November 14, 2011
RFP110156 Atchs.pdf (2,218.96 Kb)
Description: RFP110156 Attachments

RFP110156 Solicitation

Type:
Other (Draft RFPs/RFIs, Responses to Questions, etc..)
Label:
RFP110156 Solicitation
Posted Date:
November 14, 2011
RFP110156 Nov2011.pdf (3,082.82 Kb)
Description: RFP110156 Brumidi Corridor Restoration Conservation

Amendment 1

Type:
Mod/Amendment
Posted Date:
November 18, 2011
Amendment 001.pdf (410.05 Kb)
Description: Amendment 001 is enclosed. Please review.

Amendment 2

Type:
Mod/Amendment
Posted Date:
December 21, 2011
RFQ110156 Amend02.pdf (7,404.59 Kb)
Description: RFP110156 AMENDMENT 02
:
Ford House Office Building
Second and D Streets, S.W.
Washington, District of Columbia 20515
United States
:
UNITED STATES CAPITOL
WASHINGTON, District of Columbia 20515
United States
:
Anthony Rowell,
Contract Specialist
Phone: 202-226-1947
Fax: 202-225-3221
:
Rudolf J. Philiposian,
Brumidi Corridor Murals Conservation and Restoration
Phone: 2022261492
Fax: 202 225 3221