Skip to main content

Mid-Atlantic CAD Policy

The R03 CAD Deliverables Policy defines “further requirements” expected to be adhered to for ALL GSA Design and Construction projects EXCLUSIVELY in: Delaware, Pennsylvania, West Virginia, and parts of Maryland, New Jersey and Virginia.

This provided ZIP archive includes policy document, list of changes from previous version, title-block template DWGs, AutoCad pen tables, AIA Layer Guideline spreadsheet, and a NCS4 statement of compliance form.

GSA PBS Region 3 CAD Deliverables Policy - October 1, 2010

If you do not have a zip utility to open the file, visit Download.com (non-government link) or other similar websites to obtain one. Use of any zip file utility is solely at your own risk.

For questions about technical content, please contact your GSA project manager.

***NOTE: If your contract was signed BEFORE October 1st, 2010 and AFTER April 1st, 2008 then you may still use this version of our policy which is now one version old:

Mid-Atlantic Region CAD Policy Deliverables Policy - April1, 2008

The shortcut to this page is www.gsa.gov/midatlanticcadpolicy.


autocad,building drawings,design,construction drawings, public buildings service, region 3, r3