VF300 Wellton Station (Project CV-2) ESP with Appendices |
Wellton Station, Arizona (CV-2)The Environmental Stewardship Plan for the Construction, Operation, and Maintenance of Vehicle Fence and Related Tactical Infrastructure U.S. Border Patrol (USBP) Yuma Sector, Wellton Station, Arizona (CV-2) is available for public information and use. This project is comprised of approximately 8.8 miles of tactical infrastructure, which includes four distinct sections along the U.S. - Mexico international border within the USBP Wellton Station area of operation. These four sections of vehicle fence range from approximately 0.17 miles to 6.7 miles in length. The vehicle fence was wholly contained within the Roosevelt Easement adjacent to Cabeza Prieta National Wildlife Refuge (CPNWR). Access to the construction area required the improvement or construction of access roads on CPNWR lands designated as wilderness. Additional access was provided from the adjacent Barry M. Goldwater Range. |
| |