
Chief Counsel's Report (Released 02/17/2011)
Cover (164.62 KB) |
Acknowledgements (256.6 KB) |
Table of Contents (398.8 KB) |
Foreword (255.5 KB) |
Executive Summary (290.5 KB) |
Chapter 2: Drilling for Oil in Deepwater (3.53 MB) |
Chapter 4: Technical Findings (15.85 MB) |
Introduction (368.7 KB) |
4.1: Flow Path (2.9 MB) |
4.2: Well Design (1.19 MB) |
4.3: Cement (3.91 MB) |
4.4: Foam Cement Stability (810 KB) |
4.5: Temporary Abandonment (1.49 MB) |
4.6: Negative Test (2.4 MB) |
4.7: Kick Detection (2.64 MB) |
4.8: Kick Response (1.36 MB) |
4.9: BOP Issues (1.33 MB) |
4.10: Maintenance Issues (1.23 MB) |
Chapter 6: Regulatory Observations (1.06 MB) |
Endnotes (2.08 MB) |
Appendices |
Appendix A: Blowout Investigation Team (206.2 KB) |
Appendix B: Commission Staff and Consultants (263.6 KB) |
Appendix C: List of Acronyms (203.31 B) |
Appendix D: Chevron Letter (560.5 KB) |
Appendix E: Nile and Kaskida (348.8 KB) |