HUD Logo
USA%20Flag  
Connect with HUD
HUD Podcasts
Site Map         A-Z Index         Text   A   A   A
HUD   >   Program Offices   >   Chief Information Officer   >   System Development at HUD
System Development at HUD (SDM) 
IMPORTANT NOTICE TO CURRENT IT PROJECTS: Effective April 2011, HUD policy established the Project Planning and Management (PPM) Life Cycle, for all IT projects. The PPM Life Cycle replaces HUD's previous System Development Methodology (SDM). Current IT contracts that require projects to follow the SDM will be addressed by the Government Technical Representatives (GTRs) on a case-by-case basis in order to determine how much, if any, of the work can be incorporated into the new PPM Life Cycle.

The purpose of this site is to guide you through the HUD System Development Methodology (SDM) process, and provide easy access through the links below to the policies, procedures, and standards required to successfully develop systems at HUD.

Over the years we've put in place a number of policies and procedures for developing Information Technology (IT) systems. In addition, we've established IT Infrastucture and System Development platform standards for both IT operations and system development.

System Development Lifecycle at HUD

Project Leader Help Guide

  • Project Leader Help Guide (PDF)

    The Project Leader Help Guide helps the new Project Leader, contractor or developer in understanding how HUD works, and how to successfully plan and manage an IT project at HUD. It's a roadmap to help navigate through key HUD processes, and provides basic guidance concerning what action is required, why the action is required, and when to typically take action.

Quality Assurance