United States Nuclear Regulatory Commission - Protecting People and the Environment
Home > NRC Library > Document Collections > Interim Staff Guidance > Interim Staff Guidance Used by the Division of Fuel Cycle Safety and Safeguards (FCSS)

Interim Staff Guidance Used by the Division of Fuel Cycle Safety and Safeguards (FCSS)

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Interim Staff Guidance (ISG) Topic
FCSS-ISG-01 Methods for Qualitative Evaluation of Likelihood
FCSS-ISG-02 Canceled as no longer needed
FCSS-ISG-03 Nuclear Criticality Safety Performance Requirements and Double Contingency Principle
FCSS-ISG-04 Baseline Design Criteria
FCSS-ISG-05 Reporting Requirements
FCSS-ISG-06 Canceled as no longer needed
FCSS-ISG-07 Canceled as no longer needed
FCSS-ISG-08 Natural Phenomena Hazards
FCSS-ISG-09 Initial Event Frequencies
FCSS-ISG-10 Justification for Minimum Margin of Subcriticality for Safety
FCSS-ISG-11 Reserved
FCSS-ISG-12 Reportable Safety Events per 10 CFR Part 70 Appendix A
FCSS-ISG-13 Estimating Decommissioning Costs For Uranium Enrichment Facilities

Draft FCSS Interim Staff Guidance

Document Number Title Date Published in Federal Register Comment Deadline
None None None None
Page Last Reviewed/Updated Tuesday, June 26, 2012