Home
>
NRC Library
>
Document Collections
>
Interim Staff Guidance
> Interim Staff Guidance Used by the Division of Fuel Cycle Safety and Safeguards (FCSS)
Interim Staff Guidance Used by the Division of Fuel Cycle Safety and Safeguards (FCSS)
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Interim Staff Guidance (ISG) | Topic |
---|---|
FCSS-ISG-01 | Methods for Qualitative Evaluation of Likelihood |
FCSS-ISG-02 | Canceled as no longer needed |
FCSS-ISG-03 | Nuclear Criticality Safety Performance Requirements and Double Contingency Principle |
FCSS-ISG-04 | Baseline Design Criteria |
FCSS-ISG-05 | Reporting Requirements |
FCSS-ISG-06 | Canceled as no longer needed |
FCSS-ISG-07 | Canceled as no longer needed |
FCSS-ISG-08 | Natural Phenomena Hazards |
FCSS-ISG-09 | Initial Event Frequencies |
FCSS-ISG-10 | Justification for Minimum Margin of Subcriticality for Safety |
FCSS-ISG-11 | Reserved |
FCSS-ISG-12 | Reportable Safety Events per 10 CFR Part 70 Appendix A |
FCSS-ISG-13 | Estimating Decommissioning Costs For Uranium Enrichment Facilities |
Draft FCSS Interim Staff Guidance
Document Number | Title | Date Published in Federal Register | Comment Deadline |
---|---|---|---|
None | None | None | None |
Page Last Reviewed/Updated Tuesday, June 26, 2012