Task Order Checklist – Reports and Deliverables
Prescribed by HHSAR 304.803-70 Current as of May 8, 2009
Contract number: _________________
Task order number: _________________
Contractor name: ___________________________
Award date: ______________
Performance period: ____________________________
Separate each task order by its own numbered tab – e.g., Task Order #1, #2, etc. File completed/received reports and deliverables under the appropriate tab in this folder. If a report, deliverable, or other document is filed other than in the task order file, indicate its location under the respective tab.
Tab A – Technical Progress Reports
Technical progress reports
Task order COTR receipt, acceptance, comments
Other
Tab B – Final Report
Final Report
Task order COTR receipt, acceptance, comments
Other
Tab C – Deliverables other than Reports
Deliverables
Drawings
Task order COTR receipt, acceptance, comments
Other