Task Order Checklist – Unsuccessful Proposals
Prescribed by HHSAR 304.803-70 Current as of May 8, 2009
Contract number: _________________
Contractor name: ___________________________
Award date: ______________
Performance period: ____________________________
Separate each task order by its own numbered tab – e.g., Task Order #1, #2, etc. File original copies of unsuccessful task order proposals in this folder. List each organization submitting an unsuccessful proposal by name and separate each proposal with a lettered tab. If a proposal(s) is too large to be filed in this folder, list the name of the offeror next to a lettered tab and reference in the blank provided the proposal’s location and the identification of the folder/file it is in.
Tab | Unsuccessful Organizations |
---|---|
A | ______________________________ |
B | ______________________________ |
C | ______________________________ |
D | ______________________________ |
E | ______________________________ |