Skip Navigation

Federal Communications Commission

English Display Options

by: Wireline Competition Bureau

October 1st, 2012

Welcome to the home page for the Wireline Competition Bureau's (WCB) cost model virtual workshop, through which the Bureau is soliciting input from the public on Connect America Fund (Connect America) Phase II cost model design and inputs. A notice announcing this virtual workshop was released on September 12, 2012.

The virtual workshop will take place over a period of weeks sufficient to allow public input on all material issues. Discussion on multiple related topics will be facilitated through the various subject matter-specific discussion forums listed below. The Bureau will announce which topics will be discussed in which timeframes by Public Notice and on this page.

If you would like to make longer posts, we encourage you to place them in the Commission’s public comment site (ECFS) as an ex parte and place a summary of the post with the relevant URL in the forum. Similarly, if you would like to include an attachment to a post, include the URL for the attachment in your post. To ensure security, the forums will not support live links or attachments. ECFS can be reached here.

At the close of the virtual workshop, an electronic copy of all posts will be placed in the official record of the relevant dockets, much as a transcript of a hearing would be placed in the record.

If you have any questions about the format or operation of the virtual workshop or have any difficulties accessing any of the subject matter forums, please contact Katie King at 202-418-1500, katie.king@fcc.gov.

Comment Guidelines

Comments are moderated for conformity to the following guidelines:

  • Comments will be part of the official rulemaking record.
  • Commenters must identify themselves by name. Anonymous comments will not be included in the rulemaking record.
  • Comments must directly address the specific topics identified in the virtual workshop forum and the particular issue raised. We reserve the right to move comments that do not deal with the particular issue being addressed in one discussion forum to other discussion forums as appropriate.
  • Commenters should follow the same decorum they would in a face to face workshop.
  • Comments containing personal attacks or abusive language will not be included.

Issues for Comments

Please visit each of the following posts to provide comments on specific issues.

Please see each of the following Public Notices for additional detail on the specific issues raised in the Virtual Workshop.

blog comments powered by Disqus
Bureaus & Offices: Wireline Competition
close
FCC

You are leaving the FCC website

You are about to leave the FCC website and visit a third-party, non-governmental website that the FCC does not maintain or control. The FCC does not endorse any product or service, and is not responsible for, nor can it guarantee the validity or timeliness of the content on the page you are about to visit. Additionally, the privacy policies of this third-party page may differ from those of the FCC.