Skip Navigation
National Cancer Institute U.S. National Institutes of Health www.cancer.gov
NCI Wiki New Account Help Tips
Skip to end of metadata
Go to start of metadata

caCORE Build Process Current Diagram

This page shows the most current diagram of the caCORE Build Process. There are also Notes on the caCORE Build Process.
caCORE Build Process Current Diagram as discussed in the Notes

Labels
  • None
  1. Jun 05, 2008

    Change made to the May 30 version:
    Compatibility Levels removed

    Change made to the May 29 version:
    "Passed" removed from Compatibility Review box and indicated for Yes and No

    Change made to the May 28 version:
    "Silver Level" added to the Compatibility Review label in phase 5; Silver level bar at the top extended into phase 5

    Summary of changes to the May 6 version:
    Output of phase 3 identified as Loaded Annotated XMI File
    Compatibility review moved to top of phase 5 with Yes/No branching
    Note: When Introduce is used to generate code, the compatibility review can be performed at the end of phase 5 (not shown to ensure the step to assemble project information is included in all the flows).

    Summary of changes to the May 3 version:
    Use of caAdapter clarified at steps one and two
    Input step added for caGrid Introduce Toolkit

    Summary of changes to the April 29 version:
    caBIG compatibility levels clarified