Skip Navigation

Email Updates E-mail subscriptions envelope Font Size Reduce Text Size Enlarge Text Size     Print Print     Download Reader PDF

HHSAR Changes After April 26,2010

Affected HHSAR Section

Nature of Change

Date of Change

Authority Sections (throughout)

Updated to 40 U.S.C. 121(c)(2)

Technical correction[1]
9-2010

301.602-3

Changed from $100,000 to $150,000

FAC 2005-45, August 30, 2010 (eff. 10/1/10)

301.604

Corrected reference to 304.7100

Technical correction
9-2010

301.604-70

Deleted reference to date of the COTR Handbook

Technical correction
9-2010

301.608

Changed from $100,000 to $150,000

FAC 2005-45, August 30, 2010 (eff. 10/1/10)

302.7000

Changed first cited reference to IT to 301.607-71(a)

Technical correction
9-2010

304.602

Changed url for DCIS manual to http://dcis.hhs.gov/manual.html

Technical correction
9-2010

304.7001(e)

Changed url for DCIS manual to http://dcis.hhs.gov/manual.html

Technical correction
9-2010

307.7101(a)(5)

Changed from $5.5M to $6.5M and $11M to $12M

FAC 2005-45, August 30, 2010 (eff. 10/1/10)

307.7107

Corrected references to 307.7104(e) in table to 307.104(d)

Technical correction
9-2010

307.7108(c)

Superseded the following language:
“Phasing. Individual research, development, or demonstration projects frequently lie well beyond the present state of the art and entail procedures and techniques of great complexity and difficulty. Under these circumstances, a contractor, no matter how carefully selected, may be unable to deliver the desired result. Moreover, the job of evaluating the contractor's progress is often difficult. Such a contract is frequently phased and often divided into stages of accomplishment, each of which the contractor must complete and the Contracting Officer approve before the contractor may proceed to the next phase or stage. Phasing makes it necessary to develop methods and controls, including reporting requirements for each phase of the contract and criteria for evaluation of the report submitted, that will provide, at the earliest possible time, appropriate data for making decisions relative to future phases. A phased contract, such as one for an R & D or demonstration project, may include stages of accomplishment. Within each phase, there may be a number of tasks that the SOW should include. When phases of work can be identified, the SOW shall provide for phasing and the solicitation shall require offerors to submit proposed costs by phases. The resultant contract shall reflect costs by phases, require the contractor to identify incurred costs by phases, establish delivery schedules by phase, and require the written acceptance of each phase. The Contracting Officer shall not allow contractors to incur costs for phases that are dependent upon successful completion of earlier phases until the Contracting Officer provides written acceptance of the prior work.”

6/28/10 (APM 2010-01)

315.404-4

Changed from $100,000 to $150,000

FAC 2005-45, August 30, 2010 (eff. 10/1/10)

317.105-1(c)

Superseded the following language:
“The funding required for performance of each year of a multi-year contract under FAR Subpart 17.1 and this subpart must be provided in full at the start of that program year.”

6/28/10 (APM 2010-01)

317.105-1(d)

Added

6/28/10 (APM 2010-01)

317.105-1(d)

Changed from $11.5M to $12.5M

FAC 2005-45, August 30, 2010 (eff. 10/1/10)

332.702

Added

6/28/10 (APM 2010-01)

332.702-70

Added

6/28/10 (APM 2010-01)

332.703

Added

6/28/10 (APM 2010-01)

332.703-1(b)

Added

6/28/10 (APM 2010-01)

332.703-71

Added

6/28/10 (APM 2010-01)

332.703-72

Added

6/28/10 (APM 2010-01)

332.705

Added

6/28/10 (APM 2010-01)

332.705-2(b)

Added

6/28/10 (APM 2010-01)

339.101(d)(1)

Changed url to http://www.hhs.gov/ocio/about/terms/index.html

Technical correction
9-2010

339.201-70(c)(3), (4), and (5)

Changed from $100,000 to $150,000

FAC 2005-45, August 30, 2010 (eff. 10/1/10)

352.201-70

Corrected prescription to 301.106(c)

Technical correction
9-2010

352.223-70

Corrected prescription to 323.7002(a);

Technical correction
9-2010

352.231-70

Corrected prescription to 331.101-70(b)

Technical correction
9-2010

352.232-70

Added

6/28/10 (APM 2010-01)

352.232-71

Added

6/28/10 (APM 2010-01)

352.232-72

Added

6/28/10 (APM 2010-01)

352.239-70

Changed url to http://scap.nist.gov/validation/ 

Technical correction
9-2010

352.239-73(b)

Changed from $100,000 to $150,000

FAC 2005-45, August 30, 2010 (eff. 10/1/10)

352.270-1

Corrected prescription to 370.102(a)

Technical correction
9-2010

352.270-4

Changed web address

Technical correction
9-2010

353.3

Deleted redundant authority citation at end

Technical correction
9-2010

353.370-653

Added

Technical correction-
9-2010

370.503

Changed reference to Miller Act to 40 U.S.C. 3131 et seq.

Technical correction-
9-2010

 



[1] The reference to “technical correction” means a change that is distinct from and subsequent to the Federal Register publication of formal “technical amendments” on April 26, 2010.