Research Documents

Recent Connected Vehicle Research

Institutional and Policy Reports

Research Reports - Technical: Basic - Communications Systems

Research Reports - Technical: Basic - DSRC and Proof of Concept Test

Research Reports - Technical: Applications - Tolling E-Payments

Research Reports - Technical: Applications - Vehicle Safety

Research Reports - Technical: Applications - Intersection Collision Avoidance

Research Reports SafeTrip 21

Additional Documents

Copies of the following documents can be obtained by contacting Mike Pina, Communications Program Manager, at Mike.Pina@dot.gov

Research Reports - Technical: Basic - DSRC and Proof of Concept Test

  • Final Report: Proof of Concept Executive Summary-Infrastructure (Feb 2009)
  • Final Report: Proof-of-Concept Technical Description-Infrastructure (Feb 2009)
  • National System Requirements Version 1.3.1 (Apr 2008)
  • Network Subsystem Specification (SSS) Version 1.1 (Apr 2007)
  • Service Delivery Node (SDN) Subsystem to Road-Side Equipment (RSE) Subsystem [I-06] Software Interface Requirements Specification Version 1.1 (Feb 2007)
  • Network User to Service Delivery Node (SDN) Subsystem [X-031, X-032, X-033] Software Interface Requirements Specification Version 1.1 (Feb 2007)
  • Data Element Dictionary Version 1.0 (Feb 2007)
  • Lexicon Version 1.1 (Feb 2007)
  • ENOC System Specification (SSS) (Feb 2007)
  • ENOC to Administrative User [X-011] Software Interface Requirements Specification (Feb 2007)
  • ENOC to Managed Entity (ME) [Managed Entity] Software Interface Requirements Specification (Feb 2007)
  • ENOC to Managed Network Element (MNE) [I-08 and I-11] Software Interface Requirements Specification (Feb 2007)
  • ENOC to Service Delivery Node (SDN) Subsystem [1-11] Software Interface Requirements Specification (Feb 2007)
  • Concept of Operations Version 1.2 (Sep 2006)
  • Communications Analysis Version 3.0 (Jul 2006)
  • VII USDOT Day-1 Use Case Descriptions Version 1.0 (May 2006)
  • DSRC Technology and the SCRC Industry Consortium (DIC) Prototype Team White Paper (Jan 2005)

Research Reports - Technical: Applications - Vehicle Safety

Research Reports - Technical: Applications - Intersection Collision Avoidance

  • Sign Comprehension, Rotation, Location, and Random Gap Analysis (Sep 2008)
  • Vehicle Safety Communications - Applications First Annual Report (Sep 2008)
  • CICAS Program Overview (Jan 2008)
  • Gap Assistance Projects Within the CICAS Program (Oct 2007)
  • CICAS Program Update (Oct 2007)
  • Intersection Collision Avoidance - Violation Project: Task 5 Final Project Report (Sep 2007)
  • California Intersection Decision Support: A Systems Approach to Achieve Nationally Interoperable Solutions II (Jan 2007)
  • Intersection Decision Support: Evaluation of a Violation Warning System to Mitigate Straight Crossing Path Collisions (Apr 2006)
  • CICAS-V Research on Comprehensive Costs of Intersection Crashes (Updated)

Research Reports - Technical Applications - Transit

  • Transit VII Strategic Plan (Nov 2007)
  • Vehicle-Infrastructure Integration: Applications for Public Transit (Nov 2007)

 

Additional ITS Resources on the Federal Highway Administration Office of Operations Website




RITA's privacy policies and procedures do not necessarily apply to external web sites.
We suggest contacting these sites directly for information on their data collection and distribution policies.